All key details in one clear process.
Office relocation Lugano
Office relocation in Lugano (canton TI): we coordinate the work around both addresses and the agreed date. An office move affects workspaces, staff and business operations at the same time. Tetrismove supports the transport of office furniture and equipment through agreed stages. A named coordinator, complete inventory and realistic access windows are essential. Packing, assembly and disposal are defined in the quote before work starts.
What can we plan for you?
- 1 Service
- 2 Route
- 3 Details
- 4 Request
Route, access and services described clearly.
Moving and cleaning in every region.
Review the services and price before booking.
Lugano
For a booking in Lugano in canton TI, check both access routes separately. Provide the complete address, usable lift, floors and the distance between the building and vehicle. A photo often describes a narrow staircase or long courtyard more accurately than the size of a flat alone. Check with the property manager and relevant authority whether a loading space or access arrangement is needed; requirements depend on the actual address.
- Municipality
- Lugano
- Canton
- Ticino (TI)
- Postcodes and localities
- 6823, 6900, 6912, 6913, 6914, 6915, 6917, 6918, 6932, 6951, 6959, 6962, 6963, 6964, 6965, 6966, 6967, 6968, 6974, 6976, 6977, 6978, 6979
The table distinguishes postal localities from the municipality. The correct postcode and house number avoid confusion, particularly where a municipality contains several localities. Include the entrance, any rear courtyard and a reachable contact person. The service is planned for your address; this page describes a service area and does not identify a branch office.
| Postcode | Locality | Address details needed |
|---|---|---|
| 6823 | Pugerna | Add the street, house number and building entrance |
| 6900 | Lugano | Add the street, house number and building entrance |
| 6912 | Pazzallo | Add the street, house number and building entrance |
| 6913 | Carabbia | Add the street, house number and building entrance |
| 6914 | Carona | Add the street, house number and building entrance |
| 6915 | Pambio-Noranco | Add the street, house number and building entrance |
| 6917 | Barbengo | Add the street, house number and building entrance |
| 6918 | Figino | Add the street, house number and building entrance |
| 6932 | Breganzona | Add the street, house number and building entrance |
| 6951 | Bogno | Add the street, house number and building entrance |
| 6951 | Colla | Add the street, house number and building entrance |
| 6951 | Cozzo | Add the street, house number and building entrance |
| 6951 | Insone | Add the street, house number and building entrance |
| 6951 | Scareglia | Add the street, house number and building entrance |
| 6951 | Signôra | Add the street, house number and building entrance |
| 6959 | Certara | Add the street, house number and building entrance |
| 6959 | Cimadera | Add the street, house number and building entrance |
| 6959 | Curtina | Add the street, house number and building entrance |
| 6959 | Maglio di Colla | Add the street, house number and building entrance |
| 6959 | Piandera Paese | Add the street, house number and building entrance |
| 6962 | Viganello | Add the street, house number and building entrance |
| 6963 | Cureggia | Add the street, house number and building entrance |
| 6963 | Pregassona | Add the street, house number and building entrance |
| 6964 | Davesco-Soragno | Add the street, house number and building entrance |
| 6965 | Cadro | Add the street, house number and building entrance |
| 6966 | Villa Luganese | Add the street, house number and building entrance |
| 6967 | Dino | Add the street, house number and building entrance |
| 6968 | Sonvico | Add the street, house number and building entrance |
| 6974 | Aldesago | Add the street, house number and building entrance |
| 6976 | Castagnola | Add the street, house number and building entrance |
| 6977 | Ruvigliana | Add the street, house number and building entrance |
| 6978 | Gandria | Add the street, house number and building entrance |
| 6979 | Brè sopra Lugano | Add the street, house number and building entrance |
The table lists postal locality areas whose building addresses lie predominantly within this municipality. A postal area can span more than one municipality. The full address is needed to plan your booking. Source: Federal Office of Topography swisstopo · data dated 01 October 2026
If your destination is outside Lugano, collection is only part of the plan. We need the same access, parking and handover details for delivery. Additional stops, storage or several recipients require an agreed order before the quotation. This makes extra journeys, waiting and handling visible before moving day.
Inventory workspaces and departments
Include more than desks and chairs. List meeting rooms, reception, archives, kitchen areas, storage and shared equipment. Assign each group a destination room or workstation code. Boxes can then be placed correctly without displaying confidential contents. Nominate a contact for each department and decide who approves retained items, disposal and new positions. An agreed floor plan is more useful than spontaneous decisions on moving day. Keep inventory changes in a shared version so that different departments are working from the same information.
Match the stages to your operation
Which teams must remain reachable? Which rooms need to be ready first? These questions determine the order of work. Several prepared phases may suit a business better than one large moving window. Evening or weekend work must be specifically agreed and is not an automatic availability promise. Allow time for building access, lift use, delayed keys or unfinished rooms. Inform staff, reception and building management of the schedule. This supports an organised move without promising uninterrupted operations that depend on several different parties.
Separate transport from technical work
Moving equipment and putting it back into service are different tasks. Your IT team should arrange backups, shutdown, identification, disconnection and reconnection. Agree suitable protective packaging for monitors, computers and peripherals. Never put access credentials on boxes. For confidential files, define containers and authorised access internally. Data destruction, server migration and network work are not automatically included moving services. Heavy, permanently connected or sensitive equipment requires individual assessment using its weight, manufacturer instructions and transport requirements.
Complete the move against the floor plan
The quote should identify staffing, vehicles, volume, stages, assembly and known access conditions. Agree who removes packing materials and what disposal is included. At the destination, distribute furniture and boxes against the plan while keeping circulation and escape routes clear. Walk through with the responsible person to check completeness, positions and agreed assembly. Functional checks on IT and specialist equipment remain with the designated professionals. Record outstanding points and the person responsible for each, so the next working day starts from a clear position.
Make dependencies between departments visible
A workstation can look ready and still be unusable because network access, permissions, files or shared equipment are missing. Identify what each department needs to start working. The moving order should not simply follow whichever rooms are quickest to empty. A short dependency overview distinguishes transport from internal commissioning.
Decide with your responsible teams which functions are needed first and which can temporarily operate elsewhere. Also determine when the old working environment will be given up permanently. Those decisions remain with your business; the moving team implements the agreed transport sequence. Provide an operational contact and avoid giving conflicting instructions to different handlers. If the floor plan changes, everyone needs the approved version before furniture and cartons are distributed using outdated destination codes. A clear decision chain reduces unnecessary handling and prevents teams from waiting on assumptions that nobody has actually confirmed.
Give staff a practical packing instruction
A short shared instruction works better than asking everyone to “pack in time”. Explain destination codes, approved containers and when individual workstations must be ready. Decide who empties drawers, reviews shared cupboards and authorises the removal of unwanted items. Personal valuables and confidential records remain the responsibility of the designated people.
Label equipment and accessories so cables, brackets and small components can be matched at the destination without revealing passwords or access credentials. An unmarked charger is harder to identify after a large office move than before it. Record what must remain in use until the last moment and may only be packed after release. Gather questions through one named contact. Special requirements can then enter the plan early rather than appearing when an occupied desk is due to be collected. This also makes the boundary between individual preparation and shared departmental tasks much easier to understand.
Prepare the first working week after the move
Transport finishes before the business has fully settled into its new space. Arrange an internal contact point for questions after arrival. Staff should know where to report unassigned items, disconnected devices and furniture positions that differ from the plan. Distinguish transport questions from technical problems and organisational decisions, so every interruption is not automatically treated as a moving error.
Prepare a simple completion status for each area: furniture placed, agreed assembly finished, cartons distributed and technical approval completed or outstanding. Only the responsible specialists can confirm technical operation. Collect empty packaging in authorised places to keep working and escape routes usable. A later materials collection or second moving stage must be expressly agreed. A common completion list helps everyone distinguish work already performed from internal setup still to be finished before normal operations resume.
Prepare photos, measurements and open questions
An enquiry does not need to be perfect, but it should distinguish confirmed details from missing information. Photograph each room as a whole, then the items or access points needing special attention. One close-up often fails to show an object’s size or the handling route. Add height, width and depth, noting any removable parts. Personal papers, screens and other confidential information do not need to appear in the photographs.
For uncertain details, write “to be checked” rather than presenting a guess as fact. This may apply to lift dimensions, vehicle access, weight or an unconfirmed key date. A short list of outstanding questions can then be worked through systematically. Organise information by address and room so photographs are not assigned to the wrong location. Clearly identify later additions and removals. An updated complete list is more helpful than many conflicting individual messages. Keep the latest confirmed version with the quote as a shared reference for everyone involved in the work.
Coordinate the building and shared spaces
Consider other people who continue using the building. Entrances, stairs and lifts cannot simply be blocked for the work. Check with management or the responsible people which areas may be used temporarily and which must remain clear. A reserved time window only helps if those affected know about it. Have the doorbell name, key access and contact details ready.
Remove loose obstacles from the agreed routes where you are authorised to do so. Do not improvise by shifting heavy or fixed components merely to widen a passage. Delicate floors or recently treated surfaces need suitable protection discussed in advance; not every tape or covering suits every material. Report known damage so the starting condition can be distinguished from later observations. Children, pets and uninvolved people should use another safe area during heavy handling. Also establish where packaging can be placed temporarily without narrowing access or escape routes. These arrangements concern the actual building, so generic assumptions about unrestricted access should not replace an on-site agreement.
Record scope and exclusions in writing
An offer is understandable when every important task has a clear place. Distinguish the main work, expressly requested extras and tasks handled by you or other parties. An unexplained “all inclusive” statement is less useful than a practical list. Ask about terms to which you might attach a particular meaning, such as dismantling, assembly, packing, cleaning, waiting time or special equipment.
The quote should match the quantities actually discussed and the known access conditions. Check whether a date has only been requested or already confirmed, and how changes should be reported. Cost items should distinguish fixed elements from additional work still requiring assessment. Payment arrangements and tax treatment should also be clear from the documents. A phone call may resolve a detail quickly, but important changes should then appear in a shared written version. You and the people carrying out the work will have the same basis when the job starts, instead of relying on different recollections of an earlier conversation.
Arrange a reachable representative and a clear handover
If you cannot stay for the whole job, appoint a representative in advance. They need access, the current scope and clear limits on what they may decide. They should know the sensitive points and which changes require your agreement first. Leaving a key alone does not answer questions about quantities or placement. Explain how you can be reached during the agreed window as well.
A short joint walk-through is useful at completion. Compare the agreed scope with the work performed, describe outstanding points precisely and identify a responsible person. A factual note naming the location and item is more helpful than a vague recollection. Sign only a description you understand and keep the associated records. If a question arises later, the reference, date and a precise explanation make it easier to connect it to the correct enquiry. A clear handover needs shared observations and identifiable next steps rather than complicated wording.
Compare the scope
| Area | Prepare beforehand | Coordinate together |
|---|---|---|
| Workstations | Inventory and destination codes | Labelling and placement |
| Business hours | Critical availability requirements | Stages and available windows |
| IT | Backups and technical ownership | Packaging and handover points |
| Files | Containers and access permissions | Labels without confidential details |
| Building | Plans, keys and lift rules | Loading, circulation and final checks |
What determines the work
A reliable quotation starts with a complete scope. Property size and distance alone are not enough: volume, access, timing, materials and additional tasks determine the team, vehicle and time needed. Tell us which preparations you will handle yourself. Compare quotations by checking that they cover the same rooms, items and carrying routes.
| Factor | Details needed | Why it matters |
|---|---|---|
| Volume | Inventory, photographs, rooms and additional areas | The actual quantity determines the resources required. |
| Access | Floor, lift dimensions, carrying route and loading space | The route affects time and equipment. |
| Date | Preferred date, handover and alternatives | The sequence and everyone involved need to align. |
| Your preparation | Packed boxes, disassembly and prepared rooms | Clear responsibilities avoid duplicated or missed tasks. |
| Additional work | Cleaning, packing, assembly, storage or disposal | Each addition needs a defined scope and position in the schedule. |
Also agree what happens if something changes: extra furniture, an unreserved lift or delayed access to the destination can affect the schedule. A written scope makes these differences easier to discuss. Binding prices and dates are set out in your individual quotation; example images and checklists do not promise a fixed package for every property.
Your preparation
Tick the points you have already clarified. This personal checklist is not submitted.
The steps in pictures
Your questions
Describe the volume, collection and delivery addresses, and your preferred date. We clarify open points and record the agreed services in writing.
044 505 14 14Can the move happen outside office hours?
Request your preferred window specifically. Evening, weekend and phased moves depend on capacity, building access and the agreed scope. Confirm the scheduled time and any additional costs in the quote.
Does Tetrismove set up the IT systems?
The move includes the transport work expressly agreed. Backups, network configuration and commissioning should be planned by your IT team or appointed specialists. Keep those tasks distinct from furniture and equipment transport.
How are workstations placed correctly?
A floor plan and consistent destination codes connect furniture, boxes and departments. Establish the labels before packing. Have a person on site who can make binding decisions when destination questions arise.
Can old office furniture be disposed of?
Disposal can be requested separately. Distinguish reusable furniture, ordinary waste and sensitive materials. Electronics, data media and confidential documents need specific arrangements; data destruction is not generally included.
How do I keep monitor cables with the correct desk?
Assign each workstation a destination number. Mark the monitor, cable pouch and transport crate with that number, and show the destination room on the floor plan. Agree with your IT team who will shut down equipment, make backups and test each workstation after arrival.